Gault Energy outgrew their existing facility so we added more storage!

We constructed two sets of concrete piers and provided two new 30,000 gallon tanks and two LC MA-15 meters as well as all the piping and valving necessary. The original transport unload/bobtail load stanchion and meter were moved and reinstalled. The existing methanol injection system was relocated and two bobtail load stanchions were fabricated and installed.